Updates as and when time is available.
December 2009
![]() |
December -
Weather has changed again now snow and frost but on we go. Move that
door...... Working late and keeping this as warm and dry as we can. With the help of the stone mason, Brian Evans and his helper Ludo... Manoir Renovations L'Esthuer, 22600 Saint Barnabé, Loudéac Tel: 02 96 26 70 21 / 06 78 26 63 96 www.manoirrenovations.com |
![]() |
![]() |
![]() |
![]() |
![]() |
Door down and rebuilt about a metre to the left, this had to be done to place the roof support stone in and also needed to be squared up, old date stone used above 1678. ![]() |
![]() |
![]() |
Now the stone supports from the roof in the kitchen and the hallway, each had to have the hole cut out of the new stone work and have to be exactly in the right place, height and measurements have to be correct to hold the new roof square. |
![]() |
![]() |
![]() |
![]() |
|
In Moreac the roof is now being constructed out of Oak, it is very difficult to give an idea of scale, so next month we will be able to take some pictures as it is brought on site and put up, if all goes well. ![]() |
![]() |
![]() |
Drawings of the roof construction.![]() |
![]() |
|
Roof construction by LAURENT Carpenters, Moreac.
|
||
![]() |
Then it snowed.... |
![]() |
|
Some pictures around on the day the white stuff came down.![]() |
![]() |
|
Has it stopped work, NO inside the covered area's to remove the old bread oven and plaster/rendering around the fire places in the hall and dining room. Behind all that plaster and rendering we find some beautiful stone to be cleaned up and pointed. |
![]() |
![]() |
![]() |
|
|
Now the snow is cleared we have the last beam to remove and the rest of
the stone work to clean up, taking out the beam with 3 generations,
Simon, Josh and me..![]() |
|
|
Other pictures around with the animals and produce from the garden for
Christmas day, first time Hera the dog has seen snow. |
|
![]() |
|
|
![]() |
On the left a cannon ball found in the stone from the main house, most
of the stone supports now in, looking forward to the roof next month, so
all targets still on track. Happy new year to you all, Tony and Gerry. |
![]() |
| Also added the Green Pages as we have now signed the first contracts for an Air to Water under floor heating system for Dining room, Kitchen and Hallway. | ||